Site Acquisition Services
Southeast
The Sprint Broadband Wireless Group® (BWG)
needed site audits performed to determine the best use of existing
facilities and equipment. Selective Site Consultants, Inc. (SSC)
conducted a site visit, prepared a summary report and audit checklist,
developed plans and schedules, and documented the site with digital
photos.
The summary report included general site information, space availability,
existing structural, power, grounding, HVAC, telephone and transport
evaluations. The audit included gathering information on existing
towers, antennas, shelters, equipment racks, power, HVAC and
communication systems.
SSC developed site plans as well as power, grounding and HVAC
plans of the existing equipment rooms. Panel and equipment rack
schedules were also produced and site photos were sorted and
cataloged.
Site audits were performed at existing tower locations in West
Palm Beach, FL; Sarasota, FL; Knoxville, TN; Nashville, TN; and
other cities in the southeast region of the United States.
Request
more information  |
|